The bottle is blown into the bottle shifting wheel, when the flushing clamp reaches the bottle neck, the jaw will clamp the bottleneck, under the guidance of the rail, the clamp will turn the bottle 180° into an upright position, through second bottle pusher into the filling position.
The filling part is manly composed of a filling valve and filling transmission parts. The washed bottle reaches the filling position via the bottle shifting wheel. In the meantime, the bottle clamping plate of the filling machine will clamp the bottle and move up to seal the bottle, filling valve will open, send the liquid into the bottle.
Three capping heads are applied in model CGN18-18-6. The capping part consists of screw heads, capping transmission part, a sorting part and an undercover tube part. The bottle which has finished filling will enter the capping position via the driving wheel.