PYJ Series
Pasteurizer Tunnel for Glass Bottle Beer
Specification | 14000x1700x1900mm |
Conveyor height | 1250mm |
Capacity | 6000CPH (500ml, Max. Diameter 66.2mm) |
Shower space | 23.8m2 |
Sterilizing time | 50min |
Sterilizing temperature | 62-68ºC |
Power | 41.5kw |
Water consumption (1bar) | 1.5 m3/h |
Equipment weight | 22T |
1) SUS 304 CE certificate
2) Capacity: 2000-40000BPH.
3) Volume: 200-2500ml
4) PET bottle, Glass Bottle, Can Bottle
General Description
Beer Pasteurizer: In order to prevent the fact that beer has sterilized for a long time because of stop of bottle-outputting conveyor, the controlling system has a function that water setting temperature (68)in high temperature zone can automatically falls into 58and that (62)in sterilizing zone can automatically fall into 60. After elimination of the faults, setting temperature will automatically recover and main motor begins to work.
Installation and commissioning
After the equipments arrived buyer's workshop, the buyer should take it's place for each equipment according to the supplied layout; the seller will send the experienced technician to guide the installation and debugging and trail production, and fulfill the designed capability within the designed time.
Training
The seller will supply technical training to the buyer. The training is includes: equipment structure and maintenance, control and operation. After training, the technicians of the buyer will grasp relevant operation and maintenance skills, and could adjust the technologies more skilled, and can deal with all kinds of malfunction in time.
After-sales service
1) After qualified of the equipment, the seller will supply one year guarantee, control system one year guarantee, free charge for wearing parts, and other spare parts with cost price. Within guarantee period, the technicians who accepted training should strictly obey the requirements asked by the seller to operate the equipments and maintenance, to find the common malfunctions and fault clearing in time; if the technicians of the buyer couldn't solve the problems themselves, the after-sales department will supply long range guide service by phone; if relevant measurements couldn't solve the problems, the seller will send the technicians to the buyer factory, clear the fault or relevant technical problems on site, the charges will reference to the installation and debugging charges.
2) After guaranteed, the seller will supply widely favorable technical support, after-sales service for the lifetime: favorable price for the wearing parts and other spare parts.
Pasteurizer Tunnel for Glass Bottle Beer
Specification | 14000x1700x1900mm |
Conveyor height | 1250mm |
Capacity | 6000CPH (500ml, Max. Diameter 66.2mm) |
Shower space | 23.8m2 |
Sterilizing time | 50min |
Sterilizing temperature | 62-68ºC |
Power | 41.5kw |
Water consumption (1bar) | 1.5 m3/h |
Equipment weight | 22T |
1) SUS 304 CE certificate
2) Capacity: 2000-40000BPH.
3) Volume: 200-2500ml
4) PET bottle, Glass Bottle, Can Bottle
General Description
Beer Pasteurizer: In order to prevent the fact that beer has sterilized for a long time because of stop of bottle-outputting conveyor, the controlling system has a function that water setting temperature (68)in high temperature zone can automatically falls into 58and that (62)in sterilizing zone can automatically fall into 60. After elimination of the faults, setting temperature will automatically recover and main motor begins to work.
Installation and commissioning
After the equipments arrived buyer's workshop, the buyer should take it's place for each equipment according to the supplied layout; the seller will send the experienced technician to guide the installation and debugging and trail production, and fulfill the designed capability within the designed time.
Training
The seller will supply technical training to the buyer. The training is includes: equipment structure and maintenance, control and operation. After training, the technicians of the buyer will grasp relevant operation and maintenance skills, and could adjust the technologies more skilled, and can deal with all kinds of malfunction in time.
After-sales service
1) After qualified of the equipment, the seller will supply one year guarantee, control system one year guarantee, free charge for wearing parts, and other spare parts with cost price. Within guarantee period, the technicians who accepted training should strictly obey the requirements asked by the seller to operate the equipments and maintenance, to find the common malfunctions and fault clearing in time; if the technicians of the buyer couldn't solve the problems themselves, the after-sales department will supply long range guide service by phone; if relevant measurements couldn't solve the problems, the seller will send the technicians to the buyer factory, clear the fault or relevant technical problems on site, the charges will reference to the installation and debugging charges.
2) After guaranteed, the seller will supply widely favorable technical support, after-sales service for the lifetime: favorable price for the wearing parts and other spare parts.
content is empty!
Subsribe Now | Get Daily Update Into Your Mail For join Now