Phone

(+86)13913617685
Products
Home / Products / Filling System-Beer / Aluminum Can Filling Machine / Automatic 330ml Glass Bottle Beer Filling Machine

loading

Automatic 330ml Glass Bottle Beer Filling Machine

Quantity:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
sharethis sharing button
  • BPCGY Series

While PET beer bottle owns many advantages such as low weight, high intensity, good tenacity, hard to be broken, transportation convenience, versatile format, and etc. For consumers, PET beer bottle is easy and safe to carry. Therefore, the world beer market began to transfer their sight to the PET bottles and it becomes a fashion in Europe and Russian Federation region.
 
Material of rotary tray and machine platform of rinser and filler Stainless steel SUS304
Main motor ABB (Switzerland)/ SEW (Germany)
Sliding bearing Igus (Germany)
Frequency inverter Danfoss (Denmark)
Touch screen SIEMENS (Germany)
PLC SIEMENS (Germany)
Contactor SIEMENS (Germany)
Breaker SIEMENS (Germany)
Air switch SCHNEIDER (France)
Pneumatic components CAMOZZI (Italy)
Seals SEALTECH (HK)
Photocell switch Omron, Keyence, P+F, SICK(Japan /Germany)
Proximity switch Omron, Keyence, P+F, SICK(Japan /Germany)




Our Company is a leading company manufacturing blowing filling and packaging machines, for PET bottle filling, 5 Gallon Filling, Glass bottle filling and aluminum CAN filling.
We also offer customer  value added  service, offering customer packaging raw material like preform label film and even beverage formula,etc.
 

 
Model CGN32-32-10H
Number of Working Positions Rinser 32, Filler 32, Capper 10
Rated Capacity 9,000BPH(1500ml)
Filling Method Gravity Filling
Applicable Bottle PET Bottle, Diameter 50-100mm,Height 150-320mm
Applicable Cap Normal Standard Cap
Air Supply Pressure 0.7 MPa
Air Consumption 0.3M3/min
Rinsing Water Pressure 0.2~0.25 MPa
Rinsing Water Consumption About 2.0T/H

 Installation and commissioning
After the equipments arrived buyer's workshop, the buyer should take it's place for each equipment according to the supplied layout; the seller will send the experienced technician to guide the installation and debugging and trail production, and fulfil the designed capability within the designed time. The installation, debugging and training is about 20-25 days.
Training
The seller will supply technical training to the buyer. The training is includes: equipment structure and maintenance, control and operation. After training, the technicians of the buyer will grasp relevant operation and maintenance skills, and could adjust the technologies more skilled, and can deal with all kinds of malfunction in time.
After-sales service
1) After qualified of the equipment, the seller will supply one year guarantee, control system one year guarantee, free charge for wearing parts, and other spare parts with cost price. Within guarantee period, the technicians who accepted training should strictly obey the requirements asked by the seller to operate the equipments and maintenance, to find the common malfunctions and fault clearing in time; if the technicians of the buyer couldn't solve the problems themselves, the after-sales department will supply long range guide service by phone; if relevant measurements couldn't solve the problems, the seller will send the technicians to the buyer factory, clear the fault or relevant technical problems on site, the charges will reference to the installation and debugging charges.
2) After guaranteed, the seller will supply widely favorable technical support, after-sales service for the lifetime: favorable price for the wearing parts and other spare parts.
 
Previous: 
Next: 

Related Articles

content is empty!

Subsribe Now     Get Daily Update Into Your Mail For join Now

Quick Links

Copyright Zhangjiagang HY-Filling Machinery Co.,ltd.  Sitemap | Support By Leadong